OLD NAPLES PROJECT

Location : 2nd Avenue South, Naples, FL
Service Rendered:

  • Design & Installation of Kitchen & Bath Cabinetry
  • Design & Installation of OutDoor Kitchen
  • Design & Installation of Wine Room
  • Design & Installation of Study
  • Installation of Italian Marble on Stair Case
  • Installation of Marble on Outdoor FirePlace
  • Installation of Italian Marble on Bathroom Floors and Shower Walls
  • Fabrication & Installation of Countertops
  • Installation of Lanai & Pool Deck with Shell Stone

Product Used :

All cabinetry is Amish HandCrafted Cabinetry
Flooring : Platina Gold – 24″ x 24″
: Legno Bastone European White Oak
Shell Stone – French Pattern – Shell Stone

 

Project Duration: 9 – 11 Weeks

GET YOUR REMODELING QUOTE