Portfolio

OLD NAPLES PROJECT

OLD NAPLES PROJECT

The beautiful Old Naples Project is located on 2nd Avenue South, Naples, FL. For this project we did design and Installation of Kitchen and Bathroom Cabinetry, design and installation of Outdoor Kitchen. In addition to that we also did design and installation for the Wine Room as well as Study.
The second phase of this project was the installation of Italian Marble on staircase, bathroom floors and shower walls; installation of marble on outdoor fireplace.
As a custom cabinets brands we provide the customer with amazing design of Amish handcrafted cabinetry in European White Oak.
For the outdoor space we Install a beautiful lanai and a pool deck with shell stone
The duration for this project was between 9 – 11 Weeks

PELICAN BAY PROJECT

This Project is located in Pelican Bay, Naples.
The service that we render for this customer was design and Installation of all cabinetry and closets. For the cabinetry and closets we used Amish handcrafted cabinets with custom design profiles.
For the outdoor space we did the Pool Deck and Spa Shell Stone installation.
Duration for this project was 6 – 8 Weeks

PELICAN BAY PROJECT
PINE RIDGE ESTATES PROJECT

PINE RIDGE ESTATES PROJECT

This project is located in Pine Ridge Estates – Naples, FL
This was a big project where we did design and installation of Kitchen and Bathroom Cabinetry. All cabinetry used is Amish handcrafted cabinetry with Legno Bastone European White Oak. We also did design and Installation of Outdoor Kitchen, Wine Room, Mud Room as well as the Entertainment Center. For the floors we used Platina Gold Marble Flooring and Legno Bastone Wood Flooring
In the Bathroom we installed Marble/Porcelain on Bathroom Walls and Shower Walls
For the outdoor space we did the pool deck with Shell Stone
Duration for this project was 10 – 12 Weeks

LIVINGSTON ESTATES PROJECT

This projects is located in Talis Park, Naples, Florida. The services we render for this clients were Design and Installation of Kitchen and Bathroom Cabinetry and we used Amish handcrafted Cabinetry. E also did thee design and installation of Outdoor Kitchen and Wine Room. For this project we used Wood Flooring with Marble Inserts and Italian Marble/Porcelain on Bathroom Floors and Shower Walls.
Project Duration was 8 – 10 Weeks

LIVINGSTON ESTATES PROJECT